INTEGRATION NOTE · LINK

Define the whole data path before testing the link.

A useful module evaluation proves that your application message reaches the receiving system under defined conditions. Agree equipment responsibilities, electrical compatibility and message handling before interpreting a communication result.

Agree what each side supplies

Source equipment
Identify the sensor, controller and message format. Confirm how the controller connects to Link and how it detects a failed exchange.
Communication hardware
Confirm the Link revision, antenna, firmware, configuration method and power arrangement for both endpoints.
Receiving equipment
Define the peer module, controller, host interface, decoding and storage or onward connection.
Engineering services
Agree who develops adapters, firmware or host software, who installs the equipment and who owns test acceptance.

Do not assume a single sample is a paired kit, a complete sensing node, a gateway or an approved end product. Confirm the bill of materials with the team.

Confirm the interface before connecting hardware

Current Link is intended for UART integration. Obtain the applicable pinout, logic levels, supply limits, grounding, protocol and configuration instructions for the supplied revision. Connector shape and wire colour in a photograph do not establish electrical compatibility.

A serial-port setting is not the wireless payload throughput. Specify payload length, reporting interval, acknowledgements, retries, allowed latency and application behaviour when a message is missing.

Half-duplex operation requires a defined exchange sequence. Ask engineering how turns, replies and retries work in the proposed configuration; do not infer simultaneous transmission and reception or an arbitrary multi-node topology.

Use a staged evaluation

  1. Confirm electrical and message compatibility. Exchange a known message with the intended controller. Record the exact configuration and what the receiver actually returns.
  2. Test one representative physical route. Fix the medium, antenna positions and orientation, distance reference, enclosure and power. Record the start and end conditions.
  3. Count the results at the application boundary. Record sent and received messages, sequence numbers, duplicates, retries, delays and outages. Retain the unsuccessful runs.
  4. Review before expanding. Compare with the baseline and agreed criteria. Networking, environment changes and field deployment each need their own evaluation.

Keep a test record someone else can interpret

Include date and operator, hardware and firmware identifiers, configuration, layout photographs, measurement references, medium and enclosure details, payload and timing, raw sender and receiver logs, power conditions, acceptance criteria and observed exceptions.

Define your delivery metric explicitly. For example, application delivery can be reported as unique valid messages received divided by unique messages sent over a stated interval. This is a proposed evaluation method, not a measured Link result. A brief video of reception does not replace the message log.

Mark which statements come from a manual, a team report or a reviewed test. Keep different media and hardware versions separate; a result from an open-air layout does not establish buried or enclosure performance.

Agree what happens after the test

Name the engineering acceptance owner and the next decision: stop, change the configuration, repeat the test or plan a limited field trial. Confirm environmental protection, certifications and system responsibilities separately before use in a safety-related installation.

For the current offering and its boundaries, return to the Link product page. For existing observations, read the evidence summaries.

Questions to resolve before an OEM evaluation

What are the power requirements at both ends?

Define the transmitting and receiving assemblies separately, including their controllers, sensors and any onward connection. Ask for revision-specific supply limits and measured transmit, receive, idle and sleep currents. Battery voltage alone does not establish average energy use or operating life. Message interval, wake behaviour, retries, battery capacity and environmental conditions belong in the same evaluation record.

Is the Link module a waterproof, ready-to-install device?

Do not assume that a module, an antenna or a presentation image carries a tested ingress-protection rating. Confirm the supplied assembly, enclosure, connectors, installation method and supporting environmental test evidence. An OEM enclosure or custom development may be part of a separate project scope.

Which range and dimensions should we design around?

Use a versioned mechanical drawing for the exact module, antenna and enclosure being supplied. For range, specify the actual medium, geometry, power and message-delivery criteria. An unobstructed-air observation is not a soil, rock or freshwater specification, and a maximum-distance answer without those conditions is not a design basis.

What should an integration discussion produce?

A useful first output is a diagram of both endpoints, the sensor or logger interface, the power arrangements and the physical data path, followed by a small, controlled test with an engineering acceptance owner. Preserve the existing record and agreed monitoring functions during evaluation. Compatibility with a named logger, electromagnetic coexistence and application-level reliability require their own evidence.

What does a local sensor-data module do?

MagDatix Link carries small data messages between module-equipped endpoints. It does not replace the sensor, its controller or the onward connection from the receiving system. In a proposed sensor installation, define how the sensor controller connects to one Link module and how the peer module returns data to a receiving controller or host. The current Link Data module operates in half-duplex; a complete sensing node, gateway, enclosure and application software are separate integration responsibilities. Suitability for a particular medium and layout requires an agreed engineering evaluation.

How should an OEM test sensor-data recovery after a link interruption?

Keep an independent logger record and send readings with sequence numbers and timestamps. Interrupt the proposed link for an agreed interval, then compare the receiving record against the logger for gaps, duplicates, order and time to catch up. Test an endpoint restart separately. Document which device holds pending readings, its storage limit and whether pending readings survive a power loss. These checks assess the exact module, controller and firmware configuration; do not assume that a communication module preserves the complete monitoring record.